This note is to provide lakefront Members with a summary of changes for lakefront services to their immediate property if desired in the future.

If you are a lakefront property owner and had “rip-rap” or sand installed on your beach by Sam Vasquez in the past, this service will no longer be available.  Sam has decided he will no longer be providing work from the water via the Tipton Lakes barge.  However, Sam will continue to provide other landscaping services, so feel free to contact him.

As an alternative, If you are in need of “rip-rap” at the shoreline, dredging around your dock, or sand on your beach, PAF Construction will be on the lake the week of April 12th-23rd.  This is the firm that completed dredging work on the lake last year.  You can reach the owner,  Jeremiah Percival at 812-521-1973 to obtain a quote and to schedule for the work you would like him to complete.  Please contact Jeremiah by April 1st to secure the work to be completed.  Jeremiah did excellent work for the Association and comes highly recommended.  This will be the only time during 2021 that a homeowner will have the opportunity to have work completed from the water by PAF.  If this opportunity is missed, then the work would need to be completed from your lot or to be postponed until the following year.

As a reminder, each Owner of a Lot that abuts a pond, lake, canal, creek, or other body of water within Tipton Lakes is required to maintain the shoreline (including the “rip-rap” rock) and water’s edge adjacent to the Lot neat and clean and free of paper, trash, uncut weeds or unsightly growth or other debris.

Share.

Comments are closed.